<?xml version="1.0" encoding="utf-8"?>
<feed xmlns="http://www.w3.org/2005/Atom">
    <title>McHenry Library Addition and Renovation Blog</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/" />
    <link rel="self" type="application/atom+xml" href="http://library.ucsc.edu/mlar/atom.xml" />
   <id>tag:library.ucsc.edu,2008:/mlar//8</id>
    <link rel="service.post" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8" title="McHenry Library Addition and Renovation Blog" />
    <updated>2008-08-29T23:10:37Z</updated>
    
    <generator uri="http://www.sixapart.com/movabletype/">Movable Type 3.2</generator>
 
<entry>
    <title>Renovation Photos -- 8/28/08</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/08/renovation_photos_82808.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1113" title="Renovation Photos -- 8/28/08" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1113</id>
    
    <published>2008-08-29T22:08:24Z</published>
    <updated>2008-08-29T23:10:37Z</updated>
    
    <summary>New photos of the renovation have been supplied by Eric Baker.  I&apos;m attaching several here which document the renovation progress over the last 2.5 weeks.

Excavation outside of building for seismic stabilization:
North side of library near recent loading dock

North side of library between loading dock and foyer doors


Can you guess where this is?



Those of you guessing the view is from the old Tech Services (1st floor) area looking at the freight elevator would be right!

The infamous Pit...

Think back to the pit shown in photos from a few weeks ago.  Located on the first floor area where the oversized books used to live and going down, the pit was excavated to core down into bedrock, creating a big seismic stabilization point and forming the basis for the new column of bathrooms to be located on each floor.  Excavation was recently completed (down to ~30 ft!).  

This week&apos;s photos show the beginning of the rebuilding process.  The first step is to pour 7 ft of concrete as the base.  Have a look:






Next up for the Pit? Creating concrete forms, setting rebar, and more (much more!) cement...

Work in the coming weeks:
- Jackhammering will continue as the demolition phase winds down.  Demolition of the south and east stairs continues, as they move down floor by floor.
- External excavation continues for the seismic pillars </summary>
    <author>
        <name>Robin Dale</name>
        
    </author>
            <category term="Renovation pictures" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>New photos of the renovation have been supplied by Eric Baker.  I'm attaching several here which document the renovation progress over the last 2.5 weeks.</p>

<p><strong>Excavation outside of building for seismic stabilization:</strong><br />
<p><img alt="outside_excav1_29Aug08.jpg" src="http://library.ucsc.edu/mlar/outside_excav1_29Aug08.jpg" width="640" height="480" />North side of library near recent loading dock</p><br />
<p></p><br />
<p><img alt="outside_excav2_29Aug08.jpg" src="http://library.ucsc.edu/mlar/outside_excav2_29Aug08.jpg" width="640" height="480" />North side of library between loading dock and foyer doors</p><br />
<p></p></p>

<p><strong>Can you guess where this is?</strong></p>

<p><img alt="Floor1Freight_29Aug08.jpg" src="http://library.ucsc.edu/mlar/Floor1Freight_29Aug08.jpg" width="640" height="480" /><br></p>

<p>Those of you guessing the view is from the old Tech Services (1st floor) area looking at the freight elevator would be right!</p>

<p><strong>The infamous Pit...</strong></p>

<p>Think back to the pit shown in photos from a few weeks ago.  Located on the first floor area where the oversized books used to live and going down, the pit was excavated to core down into bedrock, creating a big seismic stabilization point and forming the basis for the new column of bathrooms to be located on each floor.  Excavation was recently completed (down to ~30 ft!).  </p>

<p>This week's photos show the beginning of the rebuilding process.  The first step is to pour 7 ft of concrete as the base.  Have a look:</p>

<p><img alt="pit1_29Aug08.jpg" src="http://library.ucsc.edu/mlar/pit1_29Aug08.jpg" width="640" height="480" /><br />
<br><br />
<img alt="pit2_29Aug08.jpg" src="http://library.ucsc.edu/mlar/pit2_29Aug08.jpg" width="640" height="480" /></p>

<p><br />
Next up for the Pit? Creating concrete forms, setting rebar, and more (much more!) cement...</p>

<p><strong>Work in the coming weeks:</strong><br />
- Jackhammering will continue as the demolition phase winds down.  Demolition of the south and east stairs continues, as they move down floor by floor.<br />
- External excavation continues for the seismic pillars </p>]]>
        
    </content>
</entry>
<entry>
    <title>Renovation Work update for week of 8/25</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/08/renovation_work_update_for_wee.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1112" title="Renovation Work update for week of 8/25" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1112</id>
    
    <published>2008-08-28T18:35:36Z</published>
    <updated>2008-08-28T20:12:50Z</updated>
    
    <summary>Just a few updates on renovation activities:
 * the &quot;pit&quot; excavation shown in the last posting has ended. The construction crews reached bedrock (necessary for seismic stability) at about 30 feet!  The new column of bathrooms will grow from this area and continue up to all floors as the renovation moves forward.
* the South and East stairs are being demolished over the next few weeks.  This is being done floor by floor.  You can expect some vibrations and noise as the staircases are removed (remember, the stairs are all concrete and rebar!).</summary>
    <author>
        <name>Robin Dale</name>
        
    </author>
            <category term="Biweekly construction schedule" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>Just a few updates on renovation activities:<br />
 * the "pit" excavation shown in the last posting has ended. The construction crews reached bedrock (necessary for seismic stability) at about 30 feet!  The new column of bathrooms will grow from this area and continue up to all floors as the renovation moves forward.<br />
* the South and East stairs are being demolished over the next few weeks.  This is being done floor by floor.  You can expect some vibrations and noise as the staircases are removed (remember, the stairs are all concrete and rebar!).</p>]]>
        
    </content>
</entry>
<entry>
    <title>McHenry Renovation: update, pictures, work next week</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/08/mchenry_renovation_update_pict_1.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1106" title="McHenry Renovation: update, pictures, work next week" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1106</id>
    
    <published>2008-08-02T03:55:00Z</published>
    <updated>2008-08-03T20:10:48Z</updated>
    
    <summary>The beginning of August finds the renovation work on McHenry Library moving along.  As McHenry Addition staff can attest, we&apos;re firmly in the demolition phase of the project.  The last few months have been marked by a great deal of drilling and concrete removal to excavate and prepare the building for its new seismic retrofits.

Here are a few photos, courtesy of Eric Baker, showing some seismic work taking place around McHenry:

Excavation on the north side between the old temporary loading dock and the Circulation offices in preparation for seismic upgrade work




Pit excavation on the West side of the 1st floor (imagine the oversized books where this almost 30&apos; deep pit now is). Future site of seismic stabilizing column of bathrooms linking all floors.







Bye Bye, Staircase... The circular staircase is demolished to meet new fire codes.





A Really Grand Foyer: the entrance to the old foyer is now completely open to accommodate necessary vehicles and demolition.




Next week&apos;s work

Pit excavation continues, excavation of seismic sites around the outside of the library continues, as possible.

Notice: Jackhammering is expected to continue through November as demolition of other staircases and pit excavation continues for seismic upgrades.</summary>
    <author>
        <name>Robin Dale</name>
        
    </author>
            <category term="Renovation pictures" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>The beginning of August finds the renovation work on McHenry Library moving along.  As McHenry Addition staff can attest, we're firmly in the demolition phase of the project.  The last few months have been marked by a great deal of drilling and concrete removal to excavate and prepare the building for its new seismic retrofits.</p>

<p>Here are a few photos, courtesy of Eric Baker, showing some seismic work taking place around McHenry:</p>

<p><strong>Excavation on the north side between the old temporary loading dock and the Circulation offices in preparation for seismic upgrade work</strong></p>

<p><img alt="dock29Jul08.jpg" src="http://library.ucsc.edu/mlar/dock29Jul08.jpg" width="640" height="480" /></p>

<p><br />
<strong>Pit excavation on the West side of the 1st floor</strong> (imagine the oversized books where this almost 30' deep pit now is). Future site of seismic stabilizing column of bathrooms linking all floors.</p>

<p><img alt="pit1_29Jul08.jpg" src="http://library.ucsc.edu/mlar/pit1_29Jul08.jpg" width="640" height="480" /></p>

<p><img alt="pit2_29Jul08.jpg" src="http://library.ucsc.edu/mlar/pit2_29Jul08.jpg" width="640" height="480" /></p>

<p><img alt="pit3_29Jul08.jpg" src="http://library.ucsc.edu/mlar/pit3_29Jul08.jpg" width="640" height="480" /></p>

<p><strong>Bye Bye, Staircase... The circular staircase is demolished to meet new fire codes.</strong></p>

<p><img alt="stairs1_29Jul08.jpg" src="http://library.ucsc.edu/mlar/stairs1_29Jul08.jpg" width="640" height="480" /></p>

<p><img alt="stairs2_29Jul08.jpg" src="http://library.ucsc.edu/mlar/stairs2_29Jul08.jpg" width="640" height="480" /></p>

<p><strong>A Really Grand Foyer</strong>: the entrance to the old foyer is now completely open to accommodate necessary vehicles and demolition.</p>

<p><img alt="Foyer29Jul08.jpg" src="http://library.ucsc.edu/mlar/Foyer29Jul08.jpg" width="640" height="480" /></p>

<p><br />
<strong>Next week's work</strong></p>

<p>Pit excavation continues, excavation of seismic sites around the outside of the library continues, as possible.</p>

<p><em>Notice: Jackhammering is expected to continue through November as demolition of other staircases and pit excavation continues for seismic upgrades.</em></p>]]>
        
    </content>
</entry>
<entry>
    <title>McHenry Library Addition Now Open </title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/03/mchenry_library_addition_now_o.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1060" title="McHenry Library Addition Now Open " />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1060</id>
    
    <published>2008-03-31T18:20:45Z</published>
    <updated>2008-03-31T18:23:42Z</updated>
    
    <summary>We&apos;re still moving and settling in, but the McHenry Addition is open for business!

The entrance to the building is now on the south side.  The old entrance will be closed off for the next 18-24 months while construction crews renovate and seismically retrofit the older part of McHenry.  Access and parking information is available on the Maps and directions page.  All of the collections, service desks, and staff have moved and we&apos;re getting unpacked.  A directory of services and floor maps of the addition is available on the McHenry page.  Some of the moves are still in process, including the Media Center&apos;s film and music collection as well as book call numbers M-PN on the third floor of the addition.  These areas will be roped off with caution tape until they&apos;re completed later this week.  Stay tuned for the announcement of a celebration and house-warming in our new digs! </summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>We're still moving and settling in, but the McHenry Addition is open for business!</p>

<p>The entrance to the building is now on the south side.  The old entrance will be closed off for the next 18-24 months while construction crews renovate and seismically retrofit the older part of McHenry.  Access and parking information is available on the <a href="http://library.ucsc.edu/info/directions.html">Maps and directions page</a>.  All of the collections, service desks, and staff have moved and we're getting unpacked.  A directory of services and floor maps of the addition is available on the <a href="http://library.ucsc.edu/mchenry/">McHenry page</a>.  Some of the moves are still in process, including the Media Center's film and music collection as well as book call numbers M-PN on the third floor of the addition.  These areas will be roped off with caution tape until they're completed later this week.  Stay tuned for the announcement of a celebration and house-warming in our new digs! </p>]]>
        
    </content>
</entry>
<entry>
    <title>Library and ITS Instructional Computing on Lab Pilot </title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/03/library_and_its_instructional.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1059" title="Library and ITS Instructional Computing on Lab Pilot " />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1059</id>
    
    <published>2008-03-31T18:13:16Z</published>
    <updated>2008-03-31T18:19:30Z</updated>
    
    <summary>The Library and Instructional Computing are partnering together on a pilot project called the Science Library lab.  Starting on March 31, 2008, the Cowell Room computer lab at the Science and Engineering Library will be supported and staffed by Instructional Computing.

Current students, staff and faculty with a UCSC login and password will be able to print their documents and have the jobs billed to their UCSC account (or bill), as is the case in other IC labs. Printing jobs using a Copier Services print card is still be an option for the public, as it is in other Library printing locations. The hardware, software and lab policies will be similar to other IC lab locations.

This pilot will run until the end of Fall Quarter, 2008, in order to gather data and analyze what the next steps will be. For more information, visit http://ic.ucsc.edu/scilib and please feel free to give us feedback at ic@ucsc.edu. </summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>The <a href="http://library.ucsc.edu/science/">Library</a> and <a href="http://ic.ucsc.edu/">Instructional Computing</a> are partnering together on a pilot project called the Science Library lab.  Starting on March 31, 2008, the <a href="http://ic.ucsc.edu/scilib/">Cowell Room computer lab</a> at the Science and Engineering Library will be supported and staffed by Instructional Computing.</p>

<p>Current students, staff and faculty with a UCSC login and password will be able to <a href="http://ic.ucsc.edu/services/printing/">print their documents and have the jobs billed to their UCSC account (or bill)</a>, as is the case in other IC labs. Printing jobs using a Copier Services print card is still be an option for the public, as it is in other Library printing locations. The hardware, software and lab policies will be similar to <a href="http://ic.ucsc.edu/services/computer_labs/">other IC lab locations</a>.</p>

<p>This pilot will run until the end of Fall Quarter, 2008, in order to gather data and analyze what the next steps will be. For more information, visit <a href="http://ic.ucsc.edu/scilib">http://ic.ucsc.edu/scilib</a> and please feel free to give us feedback at <a href="mailto:ic@ucsc.edu">ic@ucsc.edu</a>. </p>]]>
        
    </content>
</entry>
<entry>
    <title>McHenry Laptop Checkout </title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/03/mchenry_laptop_checkout.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1058" title="McHenry Laptop Checkout " />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1058</id>
    
    <published>2008-03-31T18:09:57Z</published>
    <updated>2008-03-31T18:13:07Z</updated>
    
    <summary>Beginning Winter Quarter 2008, laptops will be available for checkout from McHenry Library.  The circulation desk has 10 Apple MacBooks available for students, faculty, and staff to use in the library.  More... </summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>Beginning Winter Quarter 2008, laptops will be available for checkout from McHenry Library.  The circulation desk has 10 Apple MacBooks available for students, faculty, and staff to use in the library.  <a href="http://library.ucsc.edu/services/circ/laptop_loan.html">More... </a></p>]]>
        
    </content>
</entry>
<entry>
    <title>S&amp;E Library Spring Break Hours</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/03/se_library_spring_break_hours.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1057" title="S&amp;E Library Spring Break Hours" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1057</id>
    
    <published>2008-03-21T18:29:58Z</published>
    <updated>2008-03-21T18:30:58Z</updated>
    
    <summary>The SCIENCE &amp; ENGINEERING LIBRARY WILL BE OPEN SPRING BREAK the following hours:

Friday March 21: 8am-8pm (last day of finals)
Saturday March 22: 1pm-5pm (see restricted services below)
Sunday March 23: 1pm-5pm (Easter)
Monday March 24 - Thursday March 27: 8am-8pm
Friday March 28: CLOSED (campus holiday)
Saturday March 29: 1pm-5pm
Sunday March 30: 1pm-5pm

Regular quarter hours resume on Monday March 31.

Saturday, March 22nd: (these services will resume Sunday March 23)
There will be no off-campus access (OCA) to any licensed resources such as journals.
Cruzcat will also be unavailable. Use Melvyl or Online Journals to search our holdings, or, if you are on-campus, to find links to licensed resources.
S&amp;E Library public printing will not be available.

Please call the S&amp;E Library Reference desk at 459-2886 if you have any questions. </summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
            <category term="Sci &amp; Eng Library" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>The SCIENCE & ENGINEERING LIBRARY WILL BE OPEN SPRING BREAK the following hours:</p>

<p>Friday March 21: 8am-8pm (last day of finals)<br />
Saturday March 22: 1pm-5pm (see restricted services below)<br />
Sunday March 23: 1pm-5pm (Easter)<br />
Monday March 24 - Thursday March 27: 8am-8pm<br />
Friday March 28: CLOSED (campus holiday)<br />
Saturday March 29: 1pm-5pm<br />
Sunday March 30: 1pm-5pm</p>

<p>Regular quarter hours resume on Monday March 31.</p>

<p>Saturday, March 22nd: (these services will resume Sunday March 23)<br />
There will be no off-campus access (OCA) to any licensed resources such as journals.<br />
Cruzcat will also be unavailable. Use <http://melvyl.cdlib.org/>Melvyl or <http://ucelinks.cdlib.org:8888/sfx_ucsc/a-z/default>Online Journals to search our holdings, or, if you are on-campus, to find links to licensed resources.<br />
S&E Library public printing will not be available.</p>

<p>Please call the S&E Library Reference desk at 459-2886 if you have any questions. </p>]]>
        
    </content>
</entry>
<entry>
    <title>Library Server Outage, Saturday-Sunday </title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/03/library_server_outage_saturday.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1055" title="Library Server Outage, Saturday-Sunday " />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1055</id>
    
    <published>2008-03-20T18:44:18Z</published>
    <updated>2008-03-20T18:48:19Z</updated>
    
    <summary>During the McHenry Library move over Spring Break, the library servers and the services hosted on them will be unavailable from 8pm on Friday, March 21 until 5pm on Sunday, March 23. The following services and websites will not be available:

Library Website
Science &amp; Engineering Library Website
Cruzcat
Off-Campus Access (OCA)
Request via Interlibrary Loan
Ask-a-Librarian
Request a Library Instruction Session
SlideCat

The following services are available:

Melvyl, UC-Wide Library Catalog

Though McHenry Library will remain closed for the move until March 31, the Science &amp; Engineering Library will be open over spring break. The Library&apos;s servers and electronic resources will be available again for on- and off-campus users on Sunday, March 23.</summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
            <category term="Online Services" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>During the McHenry Library move over Spring Break, the library servers and the services hosted on them will be unavailable from 8pm on Friday, March 21 until 5pm on Sunday, March 23. The following services and websites will not be available:</p>

<p>Library Website<br />
Science & Engineering Library Website<br />
Cruzcat<br />
Off-Campus Access (OCA)<br />
Request via Interlibrary Loan<br />
Ask-a-Librarian<br />
Request a Library Instruction Session<br />
SlideCat</p>

<p>The following services are available:</p>

<p>Melvyl, UC-Wide Library Catalog</p>

<p>Though McHenry Library will remain closed for the move until March 31, the Science & Engineering Library will be open over spring break. The Library's servers and electronic resources will be available again for on- and off-campus users on Sunday, March 23.</p>]]>
        
    </content>
</entry>
<entry>
    <title>Recent photos of the McHenry Library Addition</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/03/recent_photos_of_the_mchenry_l.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1048" title="Recent photos of the McHenry Library Addition" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1048</id>
    
    <published>2008-03-07T23:45:19Z</published>
    <updated>2008-03-07T23:59:04Z</updated>
    
    <summary>It&apos;s getting closer to completion! These recent photos, taken by Eric Baker  of Library Operations, show the landscaping planting, paving at the new temporary entrance, some of the interior colors, the new library stacks end panels, and a view looking over the large reading room from the third floor balcony.






















</summary>
    <author>
        <name>lauramcc</name>
        
    </author>
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>It's getting closer to completion! These recent photos, taken by Eric Baker  of Library Operations, show the landscaping planting, paving at the new temporary entrance, some of the interior colors, the new library stacks end panels, and a view looking over the large reading room from the third floor balcony.</p>

<p><img alt="P1000518.jpg" src="http://library.ucsc.edu/mlar/P1000518.jpg" width="320" height="240" /></p>

<p><img alt="P1000519.jpg" src="http://library.ucsc.edu/mlar/P1000519.jpg" width="320" height="240" /></p>

<p><img alt="P1000521.jpg" src="http://library.ucsc.edu/mlar/P1000521.jpg" width="320" height="240" /></p>

<p><img alt="P1000524.jpg" src="http://library.ucsc.edu/mlar/P1000524.jpg" width="320" height="240" /></p>

<p><img alt="P1000529.jpg" src="http://library.ucsc.edu/mlar/P1000529.jpg" width="320" height="240" /></p>

<p><img alt="P1000530.jpg" src="http://library.ucsc.edu/mlar/P1000530.jpg" width="320" height="240" /></p>

<p><img alt="P1000538.jpg" src="http://library.ucsc.edu/mlar/P1000538.jpg" width="320" height="240" /></p>

<p><img alt="P1000533.jpg" src="http://library.ucsc.edu/mlar/P1000533.jpg" width="320" height="240" /></p>

<p></p>

<p></p>

<p><br />
</p>]]>
        
    </content>
</entry>
<entry>
    <title>McHenry Library Closed During Spring Break for Move into the Addition</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/02/mchenry_library_closed_during.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1035" title="McHenry Library Closed During Spring Break for Move into the Addition" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1035</id>
    
    <published>2008-02-22T19:19:18Z</published>
    <updated>2008-02-22T19:20:02Z</updated>
    
    <summary>McHenry will be closed during spring break: In order to carry out the move, McHenry Library will close at 5 p.m. on Friday, March 21 and will remain closed throughout spring break. Barring a crisis during the move, the library will reopen on Monday, March 31, although some areas of the addition may be temporarily closed off if moves are still underway. Some services may not be fully operational since we will still be getting settled.</summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
            <category term="Library Closed" />
            <category term="Spring Break" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>McHenry will be closed during spring break: In order to carry out the move, McHenry Library will close at 5 p.m. on Friday, March 21 and will remain closed throughout spring break. Barring a crisis during the move, the library will reopen on Monday, March 31, although some areas of the addition may be temporarily closed off if moves are still underway. Some services may not be fully operational since we will still be getting settled.</p>]]>
        
    </content>
</entry>
<entry>
    <title>New Front Door to McHenry, beginning March 31</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/02/new_front_door_to_mchenry_begi.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1034" title="New Front Door to McHenry, beginning March 31" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1034</id>
    
    <published>2008-02-22T19:17:34Z</published>
    <updated>2008-02-22T19:18:34Z</updated>
    
    <summary>After the move, access to McHenry Library will be through a temporary entrance on the southwest side of the addition (the Performing Arts side). The north side (the Bookstore side) of the existing building will be fenced off, so people approaching from the north will be routed around the construction site to the southwest entrance. The road on the south side of McHenry that has been closed for 2 years will reopen, and metered parking will again be available closer to the library.</summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
            <category term="New Library Entrance" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>After the move, access to McHenry Library will be through a temporary entrance on the southwest side of the addition (the Performing Arts side). The north side (the Bookstore side) of the existing building will be fenced off, so people approaching from the north will be routed around the construction site to the southwest entrance. The road on the south side of McHenry that has been closed for 2 years will reopen, and metered parking will again be available closer to the library.</p>]]>
        
    </content>
</entry>
<entry>
    <title>Limited Availability to Special Collections</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/02/limited_availability_to_specia.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1033" title="Limited Availability to Special Collections" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1033</id>
    
    <published>2008-02-22T19:11:31Z</published>
    <updated>2008-02-22T19:12:34Z</updated>
    
    <summary>Special Collections will have limited availability during the renovation phase. Much of the material housed in Special Collections will be temporarily stored at the UC Northern Regional Library Facility and will not be available for use. A small quantity of higher use materials will be kept on site and will be available. Please plan accordingly.</summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
            <category term="Library Closed" />
            <category term="Special Collections" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>Special Collections will have limited availability during the renovation phase. Much of the material housed in Special Collections will be temporarily stored at the UC Northern Regional Library Facility and will not be available for use. A small quantity of higher use materials will be kept on site and will be available. Please plan accordingly.</p>]]>
        
    </content>
</entry>
<entry>
    <title>What about my books while the library is closed?</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/02/what_about_my_books_while_the.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1032" title="What about my books while the library is closed?" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1032</id>
    
    <published>2008-02-22T19:09:30Z</published>
    <updated>2008-02-22T19:10:18Z</updated>
    
    <summary>While McHenry Library is closed over spring break, materials can be returned to the S&amp;E Library. Here are some more details:

* Dates for books checked out of McHenry Library have been extended: For anyone who has McHenry books checked out that were to be due during spring break, the borrowing period has been extended. No books will be due during the break.

* Interlibrary Loan materials (including those that would have been checked out from McHenry) will be available at the Science &amp; Engineering Library circulation desk. ILL materials can also be returned to the Science &amp; Engineering Library.</summary>
    <author>
        <name>Bryn Kanar</name>
        
    </author>
            <category term="Interlibrary Loan" />
            <category term="Library Closed" />
            <category term="Sci &amp; Eng Library" />
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>While McHenry Library is closed over spring break, materials can be returned to the S&E Library. Here are some more details:</p>

<p>* Dates for books checked out of McHenry Library have been extended: For anyone who has McHenry books checked out that were to be due during spring break, the borrowing period has been extended. No books will be due during the break.</p>

<p>* Interlibrary Loan materials (including those that would have been checked out from McHenry) will be available at the Science & Engineering Library circulation desk. ILL materials can also be returned to the Science & Engineering Library.</p>]]>
        
    </content>
</entry>
<entry>
    <title>McHenry Addition: New construction photos 2/8/08</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/02/mchenry_addition_new_construct.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1024" title="McHenry Addition: New construction photos 2/8/08" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1024</id>
    
    <published>2008-02-08T23:35:10Z</published>
    <updated>2008-02-08T23:38:27Z</updated>
    
    <summary>
Here are a few photos, taken by Eric Baker of Library Operations, showing paving of the ADA path and the Tote Road to the temporary loading dock on the east side, and completed shelving on the second floor.









</summary>
    <author>
        <name>lauramcc</name>
        
    </author>
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p><br />
Here are a few photos, taken by Eric Baker of Library Operations, showing paving of the ADA path and the Tote Road to the temporary loading dock on the east side, and completed shelving on the second floor.</p>

<p><img alt="P1000456.jpg" src="http://library.ucsc.edu/mlar/P1000456.jpg" width="640" height="480" /></p>

<p><img alt="P1000459.jpg" src="http://library.ucsc.edu/mlar/P1000459.jpg" width="640" height="480" /></p>

<p><img alt="P1000463.jpg" src="http://library.ucsc.edu/mlar/P1000463.jpg" width="640" height="480" /></p>

<p><img alt="P1000470.jpg" src="http://library.ucsc.edu/mlar/P1000470.jpg" width="640" height="480" /></p>

<p><img alt="P1000480.jpg" src="http://library.ucsc.edu/mlar/P1000480.jpg" width="640" height="480" /></p>]]>
        
    </content>
</entry>
<entry>
    <title>McHenry Addition: new interior photos 1/31/08</title>
    <link rel="alternate" type="text/html" href="http://library.ucsc.edu/mlar/2008/01/mchenry_addition_new_interior.html" />
    <link rel="service.edit" type="application/atom+xml" href="http://internal.library.ucsc.edu/mt/cgi-bin/mt-atom.cgi/weblog/blog_id=8/entry_id=1020" title="McHenry Addition: new interior photos 1/31/08" />
    <id>tag:library.ucsc.edu,2008:/mlar//8.1020</id>
    
    <published>2008-01-31T23:59:10Z</published>
    <updated>2008-02-04T19:07:00Z</updated>
    
    <summary>Below are new interior photos taken by Eric Baker, Library Operations. Interior finishing is moving along quite rapidly. You can see that the lighting is going in, along with the wood ceiling in the &quot;street.&quot; The shelving is being installed and pavers are being placed in the south west Reading Porch.














</summary>
    <author>
        <name>lauramcc</name>
        
    </author>
    
    <content type="html" xml:lang="en" xml:base="http://library.ucsc.edu/mlar/">
        <![CDATA[<p>Below are new interior photos taken by Eric Baker, Library Operations. Interior finishing is moving along quite rapidly. You can see that the lighting is going in, along with the wood ceiling in the "street." The shelving is being installed and pavers are being placed in the south west Reading Porch.</p>

<p><img alt="P1000422.jpg" src="http://library.ucsc.edu/mlar/P1000422.jpg" width="640" height="480" /></p>

<p><img alt="P1000424.jpg" src="http://library.ucsc.edu/mlar/P1000424.jpg" width="640" height="480" /></p>

<p><img alt="P1000431.jpg" src="http://library.ucsc.edu/mlar/P1000431.jpg" width="640" height="480" /></p>

<p><img alt="P1000432.jpg" src="http://library.ucsc.edu/mlar/P1000432.jpg" width="640" height="480" /></p>

<p><img alt="P1000438.jpg" src="http://library.ucsc.edu/mlar/P1000438.jpg" width="640" height="480" /></p>

<p><img alt="P1000451.jpg" src="http://library.ucsc.edu/mlar/P1000451.jpg" width="640" height="480" /></p>

<p><br />
</p>]]>
        