After the move, access to McHenry Library will be through a temporary entrance on the southwest side of the addition (the Performing Arts side). The north side (the Bookstore side) of the existing building will be fenced off, so people approaching from the north will be routed around the construction site to the southwest entrance. The road on the south side of McHenry that has been closed for 2 years will reopen, and metered parking will again be available closer to the library.
Posted by kanarb at February 22, 2008 11:17 AM | TrackBack