« July 2007 | Main | September 2007 »

August 29, 2007

McHenry Library: Interior construction next week


Construction within McHenry Library will be happening in three places next week, all taking place along the south wall at the 7 column line. On the first floor, a storm drain pipe will be installed along the wall near the NA call numbers. On the second floor, in room 273A, and on the third floor, between carrels 371B and 373A, windows will be removed and replaced with a wall.

This work is necessary for completion of the addition and in preparation for the renovation. The Preservation Unit is aware of the schedule and is working on solutions for protecting the collection.

--Eric Baker, Library Operations

August 27, 2007

McHenry Library: New construction photos


Here are some new photos, taken by Eric Baker, of stucco going on, windows going in, and the concrete planters for the reading gardens being built, along with some interior views.

P1000064.jpg

P1000065.jpg

P1000068.jpg

P1000069.jpg

P1000071.jpg

P1000080.jpg

P1000081.jpg

P1000082.jpg

August 22, 2007

McHenry Library: First floor abatement next week

Next Monday, August 27th, there will be an abatement on the first floor outside room 167. The following few days there will be pipe work done in the same area to supply heating hot water to the addition. The public computers outside room 167 have been removed, and the adjacent stacks will be covered with plastic. The work area will be isolated by plastic sheeting, so access around the art books, oversize books, and current periodicals will be somewhat limited during next week.

-- Eric Baker, Library Operations

August 20, 2007

McHenry Library: Temporary hot water shutdown 8/22/07-9/3/07

The campus will be shutting down heating hot water to McHenry Library from Wednesday, 8/22 until Monday, 9/3. This will coincide with work that will be done on the first floor, near room 167, to run heating hot water pipes into the addition.

--Eric Baker, Library Operations

> Date: Thu, 16 Aug 2007 16:48:51 -0700
> Subject: Shutdown HHW - McHenry Lib, 08/22/07 - 09/03/07
> UNIVERSITY OF CALIFORNIA, SANTA CRUZ
>
> UTILITY SHUTDOWN
>
> LOCATION(S): McHenry Library Building
>
> UTILITY TO BE SHUT DOWN: Heating Hot Water
>
> SCHEDULED DATES: 08/22/07 (Wednesday) - 09/03/07 (Monday)
>
> SCHEDULED TIMES: 07:00 AM (08/22/07) - 05:00 PM (09/03/07)

> REASON: Tie In - Add Pumps - New Line
>
> REQUESTED BY: Bret Caton / Bob Roseberry

> TODAY'S DATE: 08/16/07

> PLEASE NOTIFY ALL UNITS AND/OR DEPARTMENTS IN YOUR BUILDING OR AREA THAT WILL BE AFFECTED BY THIS UTILITY SHUTDOWN. THANK YOU FOR YOUR COOPERATION.
>
> FOR FURTHER QUESTIONS OR INFORMATION, PLEASE CONTACT THE "REQUESTER" OR THE PHYSICAL PLANT SERVICE CENTER WORK CONTROL DESK AT 459-4444.

August 14, 2007

Power shutdown at McHenry Library on Saturday, September 8th

We have been notified by the campus that there will be a power shut down at McHenry Library on Saturday, September 8, between 7:00AM and 5:00 PM.

--Eric Baker, Library Operations

Date: Mon, 13 Aug 2007 15:34:22 -0700

UNIVERSITY OF CALIFORNIA, SANTA CRUZ

UTILITY SHUTDOWN
LOCATION(S): McHenry Library

UTILITY TO BE SHUT DOWN: Electric - Main Building Power

SCHEDULED DATE: 09/08/07 (Saturday)

SCHEDULED TIME: 07:00 AM - 05:00 PM

REASON: Main Breaker installation

REQUESTED BY: Bret Caton/Bob Roseberry

PHONE: 9-2407 / 423-1007 CELL: 212-0192

TODAY'S DATE: 08/13/07

PLEASE NOTIFY ALL UNITS AND/OR DEPARTMENTS IN YOUR BUILDING OR AREA THAT WILL BE AFFECTED BY THIS UTILITY SHUTDOWN. FOR ELECTRICAL SHUT DOWNS, BE SURE THAT ALL COMPUTER TERMINALS IN YOUR AREA ARE TURNED OFF BEFORE THE SCHEDULED TIME TO AVOID PROBLEMS. THANK YOU FOR YOUR COOPERATION.

FOR FURTHER QUESTIONS OR INFORMATION, PLEASE CONTACT THE "REQUESTER" OR THE PHYSICAL PLANT SERVICE CENTER WORK CONTROL DESK AT 459-4444.

August 03, 2007

McHenry Library: Construction alerts for August 7th and 9th

Next week, on Tuesday, August 7th, there will be construction work happening at the southwest corner of McHenry Library as they shotcrete retaining walls for the reading garden planters as part of the landscaping work now in progress. The pumping truck will be located near the ADA ramp at the southwest corner, just outside the Reference and Government Publications offices.

On the same day, work will begin on the new telecom room which will be located in Greg Careaga's former office in the Film & Music Center. The work on the new telecom room will continue through August 31st.

Next Thursday, August 9th, there will be an abatement taking place in Room 463 on the fourth floor. This will be followed by a 3-4 day demolition of the precast concrete panel, in preparation for the fourth floor opening to the addition that will be used during the collection and staff moves.

--Eric Baker, Head of Operations

August 02, 2007

McHenry Library: 7/31/07 constructon update


7/31/07 Constructon update from Eric Baker, Head of Operations:

The jack-hammering being done on the exterior south stairs will be completed today. Tomorrow, between 8:00 AM and 10:00 AM they will be pouring concrete for the east exterior stair tower, which should not be noisy or disruptive.