May 23, 2007

McHenry Library: 26 new addition photos taken 5/11/07

Below are 26 photos taken by Lee Jaffe on a tour of the addition construction on May 11, 2007.

lee1.jpg

lee2.jpg

lee3.jpg

lee4.jpg

lee5.jpg

lee6.jpg

lee7.jpg

lee8.jpg

lee9.jpg

lee10.jpg

lee11.jpg

lee12.jpg

lee13.jpg

lee14.jpg

lee15.jpg

lee16.jpg

lee17.jpg

lee18.jpg

lee19.jpg

lee20.jpg

lee21.jpg

lee22.jpg

lee23.jpg

lee24.jpg

lee25.jpg

lee26.jpg

May 21, 2007

McHenry Library concrete finish test on 4th floor today


Devcon Construction has notified us that a sub-contractor will be performing a concrete finishing test on the fourth floor of McHenry Library today, 5/21. The test area is located at the top of the circular staircase, between two carrels on the north side of the building. Unfortunately, this will be a noisy process and although the fourth floor is the quiet study floor, there was no other location suitable for the test. Today's work came on very short notice, so I apologize for lack of forewarning.

-- Eric Baker
Head of Library Operations

May 01, 2007

McHenry Library: Construction photos 5/1/07

Here are some pictures showing the scaffolding going up around the addition and a view from inside the second floor reading room. Photos taken by Eric Baker.

DSC02183.jpg

DSC02184.jpg

DSC02185.jpg