November 10, 2005

Lower pedestrian/bicycle path between the Hahn Building and McHenry Library temporarily closed

Due to construction of the north side temporary loading dock, which began on November 7th, access to the lower path between the Hahn Building and McHenry Library is now temporarily closed. From McHenry, pedestrians and bicycles may use the bridge to the Hahn Building and Hahn parking lot, or may take Steinhart Way, where the shuttles drive. From the Hahn Building, pedestrian and bike traffic is now re-routed to a path to the left of the closed path that connects to the bridge to McHenry (see photo below). The lower path will reopen once the temporary loading dock construction is finished.

On the left is the route next to the Hahn Building (shown) that leads to the bridge to McHenry, and on the right is the closed lower path.
Path to Hahn.jpg

Photo taken from the north entrance of McHenry Library
hahn bridge.jpg

Photo taken towards the Hahn bridge and McHenry from Steinhart Way
hahn bridge steinhart.jpg

Please sign up for notifications to be updated as more construction news is posted. Questions? Contact us.

Posted by lauramcc at November 10, 2005 01:46 PM