The construction fencing has been put in place on both sides of the library. Please note that both the south side stairs from the Music Center area and the one-lane drive are still open. The fencing being installed on the north side is to protect the area where the temporary loading dock will be.
South side fencing by one-lane road

South side drive fencing showing opening for pedestrian walkway

North side fencing where temporary loading dock will be constructed

Questions? Contact us.